|
ARCHITECTURAL PLAN DEVELOPMENT -
SECOND PHASE Upon completion and approval of the preliminary plans, full size documents, and rough cost estimate, a DESIGN/BUILD AGREEMENT shall be presented for contract signing. It is recommended that site planning, rough grading, outdoor living areas, patios and trellis work be integrated into the entire residential project for complete planning. The following highlights the various 'parts' to full plans ready for submittal. SECOND PHASE PLANS: • Liaison to all engineering • Structural engineering - Calcs. and plans • Detailed foundation plan • Exact window, door call-outs • Tile, granite, cabinet details • Full framing sections • Four exterior elevations • Integrate all engineering • City and or County processing • Corrections, plan printing • Detailed specifications • Electrical and lighting plan Note: Civil engineering, rough grading plan (if required) would be an additional cost to proposed phase two planning. Allow two to three months for second phase planning and engineering. City, County processing typically takes two months. Full grading plans increases the submittal processing time. Thank you, Michael Wilson since 1987 FINE HOMES * REMODELS * CUSTOM KITCHENS CELL (76O) 8O3-5996 * EMAIL DESIGNl26O@GMAIL.COM * FAX (76O) 746-2552 LICENSE #538838 |
||
| Michael Wilson Construction - 751 Center Drive, Suite 108-257, San Marcos, CA 92069 - 760.803.5996 |